Skip to main content

BRIEF DESCRIPTION

The work will consist of maintenance dredging of Ft. Myers Beach Harbor, Lee County, Ft. Myers Beach, Florida.

The Federal Channel will be dredged to a 12-foot required depth plus 2 feet of allowable overdepth. All dredged material will be placed in the nearshore disposal area located approximately a quarter mile east from Ft. Myers Beach Pier. Maximum pumping distance will be approximately 3.5 miles.

Work also includes turbidity monitoring and environmental protection activities.

AT A GLANCE

Project Type Maintenance
TITAN Role Quality Control & Safety Management
Client Southwind Construction
Completion Date August 2016
Project Size 130.000 Cubic Yards
Contract Value $3.5M

SCOPE OF WORK

Work under this contract consisted of:

  • Removal and Disposal of Dredged Material
  • Turbidity Testing
  • Hydrographic Surveys
  • Running Pipeline with a Booster
  • Nearshore disposal area

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply