Skip to main content

BRIEF DESCRIPTION

NY/NJ Harbor deepening project consisting of the dredging and placement of material at the HARS Work Area.

Dredging is located in the area of the Port Jersey PVSC Corridor, and the scope of work consisted of dredging HARS material, shoaling, steel pile removal, removal and disposal of Stapleton Area, and maneuvering around active utilities and steel plates. Clamshell dredging used a 21 yard bucket.

Material was loaded in scows and transported to the HARS for disposal. DMIs monitored the dredged material as it was transported.

TITAN performed quality control management and site safety management for this project. In addition TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation.

Coordination of project logistics, materials and equipment

Managing the day-to-day quality control activities

Kept designated personnel and management staff apprised of status of work

Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Report and through the QCS/RMS system.

Maintained all the project quality control files.

Reported and logged any work not meeting Spec requirements.

Recorded all data in QCS database.

AT A GLANCE

Project Type Maintenance
TITAN Role Quality Control Management and Safety Management
Client Great Lakes Dredge & Dock
Completion Date August 2016
Project Size 474,000 Cubic Yards
Contract Value $7.1M

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply