BRIEF DESCRIPTION

The Banana River maintenance dredging project is for the removal of about 200,000 CY of material from a 2-mile long and 125 foot wide area of the Banana River channel to restore the depth of the channel to -13.0 feet Mean Water Level (MWL).

The permitted depth is -12.0 feet MWL, plus 1′ allowable overdepth to -13.0 feet MWL.

Currently, the average depth in this section of the channel is 10 ‘ MWL. For hydraulic dredging, the distance to the existing spoil site will be 4 miles to the farthest point, and 2 miles to the closest point to the section of channel to be dredged. Monitoring of the spoil site during and post dredging operations (while the water is drained from the spoil) will be required. A bathymetric survey of the 2-mile section of the channel to be dredged will be provided during solicitation of this work.

TITAN performed quality control management and site safety management for this project. In addition TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

AT A GLANCE

Project Type Maintenance
TITAN Role Site Safety and Health Officer, Quality Control Manager, and pre-construction plans
Client Florida Dredge and Dock
Completion Date May 2017
Project Size 202,000 Cubic Yards
Contract Value $5,945,000

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!