Skip to main content

BRIEF DESCRIPTION

Project was for removing and disposing of shoaled material which had accumulated in the channels since last dredging. A hydraulic cutter suction dredge was used for a dredging depth of 12′ plus 2′ of allowable overdepth for the AIWW and 9′ plus 2′ of allowable overdepth for the USCG channels and basin. The estimated quantity of material to be dredged is 500,000 cubic yards. Disposal of dredged material will be on ocean beaches and disposal islands. The disposal islands are confined disposal areas with containment dikes and spillway systems. Spillway system repairs and dike embankment work will be required. Conducted safety inspections on all pieces of equipment

TITAN performed quality control management and site safety management for this project. In addition TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

AT A GLANCE

Project Type protection
TITAN Role 2 SSHO’s to the project.
Client Norfolk Dredging

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply