BRIEF DESCRIPTION
This dredging project was to remove 127,000 cubic yards of soft sandy material along a portion of the Delaware River between Philadelphia, PA to Trenton, NJ.
Logistics consisted of removing the material with a clamshell dredge, transporting the material down river, and unloading the material at a nearby unloading site.
Titan Provided a Quality Control Manager (COCM) to the project.
AT A GLANCE
Project Type | maintenance |
TITAN Role | Quality Control Manager (COCM) |
Client | Southwind Construction |
Does your personnel know the process to work on federal projects?
We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.
How much notice is needed in order for you to mobilize to the job?
In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.
What is included in TITAN personnel proposals?
We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!