The Venice Inlet Maintenance dredging project was to dredge shoaled areas in the Gulf Intracoastal Waterway (GIWW) and Venice Inlet. The required depth to be dredged was 9’ with a 2’ allowable over depth and seven 7 feet Mean Lower Low Water (MLLW) with a 1-foot allowable over depth.

All dredged material was beach-quality and was placed in the beach disposal area, just south of Venice Inlet.

Environmental work included daily turbidity monitoring, daily environmental species monitoring, and vibration monitoring. Beach fill quality control was also necessary

Titan Provided a: Quality Control (QC) Manager

AT A GLANCE

Project Type maintenance
TITAN Role Quality Control Manager
Client Florida Dredge and Dock

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply