Skip to main content

BRIEF DESCRIPTION

Project work consists of maintenance dredging the Federal navigation channel at Gordon Pass to Naples and the adjoining settling basin with disposal of excavated material in the designated beach placement area south of the inlet.

The 80,000 c.y. will be divided into 4 dredging cuts. Digging down to a 12-foot allowable depth with a 2-foot overdepth. Work also includes turbidity monitoring, vibration control and monitoring, and endangered species monitoring.

Titan Provided a Site Safety & Health Officer (SSHO) & Quality Control (QC) Manager

AT A GLANCE

Project Type maintenance
TITAN Role Site Safety & Health Officer (SSHO) & Quality Control (QC) Manager
Client Southwind Construction

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply