The Philadelphia Naval Reserve Basin Dredging project consisted maintenance dredging and unclassified excavation. Great Lakes Dredge & Dock was the Contractor of this project. TITAN provided the Quality Control Manager.

Dredging is located in the Philadelphia Naval Reserve Basin and entrance channel of the Schuylkill River. The scope of work consists of dredging material and debris, consisting of sediment, wood, concrete, steel, miscellaneous and MEC/UXO to MLLW 30ft. Dredging is completed in four acceptance sections. Dredged material is unloaded from scows and hydraulically offloaded to the Ft. Mifflin disposal site. The material is then run through a sluice to manage effluent densities

Titan Provided a Quality Control (QC) Manager

AT A GLANCE

Project Type dredging
TITAN Role Quality Control (QC) Manager
Client Great Lakes

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.