Skip to main content

BRIEF DESCRIPTION

This dredging project includes 19 miles of beach from Robert Moses State Park on the west end of the island, to Smith County Park at the east end and includes removal and placement of approximately 1 million cubic yards of material along the Long Island coastline.

TITAN performed quality control management services. In addition, TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation.

AT A GLANCE

Project Type Stabilization
TITAN Role Quality Control Management
Client Great Lakes Dredge & Dock
Completion Date Ongoing
Project Size 1,000,000 Cubic Yards
Contract Value $23.4M

SCOPE OF WORK

Work under this contract consisted of:

  • Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation.
  • Coordination of project logistics, materials and equipment
  • Managing the day-to-day quality control activities
  • Overseeing safety aspects of the job
  • Kept designated personnel and management staff apprised of status of work
  • Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Report and through the QCS/RMS system.
  • Maintained all the project quality control files.
  • Reported and logged any work not meeting Spec requirements.
  • Recorded all data in QCS database.

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply