BRIEF DESCRIPTION

Dredging deepening and widening the entrance of the Federal Navigation Channel at Mattituck, NY. This addressed the beach erosion to the east of the inlet and the excess build-up of sand to the west of the inlet. The entrance to Mattituck Inlet was dredged to a depth of 11 feet plus 2 feet of overdepth. The sand that was dredge, and the sand which had been removed, was used to replenish the beach on the east site.

Approximately 90,000 cubic yards of sand was removed from the channel and 10,000 cubic yards was removed from the up-drift jetty.

This project had a variety challenges and most of them were weather related. The weather broke record lows in temperature and high winds continually pounded Mattituck Inlet. However, TITAN worked with Village Dock, Inc 24/7 on this round-the-clock dredging project with rotating crews. We enjoyed working with Village Dock, Inc. and the USACE Buffalo District, and we send out a special nod to the committed dredging personnel at Village Dock that persistently stayed the course despite the weather.

AT A GLANCE

Project Type Channel Deepening & Beach Restoration
TITAN Role Quality Control Management and SSHO
Client Village Dock, Inc
Completion Date February 2014
Project Size 90,000 cubic yards
Contract Value $2.5M

SCOPE OF WORK

Work under this contract consisted of:

  • Quality control and site safety
  • Scheduling, reviewing, certifying, and managing all submittals through the three phase process of inspection
  • Procedures for tracking preparatory, initial, and follow-up control phases
  • Control, verification, and acceptance tests including documentation
  • Coordination of project logistics, materials, and equipment
  • Managing the day-to-day quality control activities
  • Managed safety aspects of the job

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply