BRIEF DESCRIPTION
This project was for Maintenance dredging at the Marine Corp Support Facility. The project was between Station 0+00 to Station 56+09.1 with a 38’ Mean Lower Low Water maintenance depth.
Placement for the dredged material was at Dayson Island and included additional Environmental tasks such as bird monitoring, turbidity testing, disposal monitoring and stand-by time. The contract incorporated 2-feet of allowable over depth.
Titan Provided a Project Safety (SSHO) and Quality Control (Quality Control Manager) to this project.
AT A GLANCE
Project Type | Maitenance |
TITAN Role | Quality Control Manager and SSHO |
Client | Southwind Construction |
Does your personnel know the process to work on federal projects?
We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.
How much notice is needed in order for you to mobilize to the job?
In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.
What is included in TITAN personnel proposals?
We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!