BRIEF DESCRIPTION

This shoal removal involved dredging non-rock materials. Suitable non-rock materials were placed at the HARS (Historic Area Remediation) site. Unsuitable non-rock materials were placed upland at a soil cleaning and disposal facility. This project was located in an active navigation channel and used a cable-arm clam-shell dredge with a 26 cubic yard bucket. Six scows and two tugs moved the possibly contaminated materials to the HARS and upland.

TITAN performed quality control and site safety. In addition TITAN handled reviewing, scheduling, certifying and managing the submittals through the 3-Phase process of inspection.

Procedures for tracking preparatory, initial, and follow-up control phases; control, verification, and acceptance tests including documentation.

Coordination of project logistics, materials and equipment

Managing the day-to-day quality control activities

Overseeing safety aspects of the job

Kept designated personnel and management staff apprised of status of work

Ensured all reports were prepared and submitted in accordance with the QC Plan, including the Daily Quality Control Report and through the QCS/RMS system.

Maintained all the project quality control files.

Reported and logged any work not meeting Spec requirements.

Recorded all data in QCS database.

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!