BRIEF DESCRIPTION

This project involved dredging and placement of non-rock materials. The non-rock materials suitable for Historic Area Remediation Site (HARS) placement was placed at the HARS Site. The non-rock materials unsuitable for HARS placement was placed Upland at a soil cleaning and disposal facility. This contract involved the use of a cable-arm clam-shell dredge with 26 cubic yard bucket. 6 scows and 2 tugs were used to move the potentially contaminated material to be deposed at the HARS and Upland. This dredging project also involved working in an active navigation channel with frequent ship traffic.

AT A GLANCE

Project Type Maintenance
TITAN Role Quality Control & Safety Management
Client Southwind Construction
Completion Date August 2016
Project Size 130.000 Cubic Yards
Contract Value $3.5M

SCOPE OF WORK

Work under this contract consisted of:

  • Removal and Disposal of Dredged Material
  • Turbidity Testing
  • Hydrographic Surveys
  • Running Pipeline with a Booster
  • Nearshore disposal area

Questions About TITAN Personnel

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply