Skip to main content

BRIEF DESCRIPTION

Removal of shoaled material that has accumulated in the channels since the various area were last dredged. The depth of 12′ was required plus an additional 2 feet of allowable over depth for the AIWW Channels. The total estimated quantity of material to be dredged was 355,000 cubic yards.

Titan Provided a Project Safety (SSHO) and Quality Control (Quality Control Manager) to this project.

AT A GLANCE

Project Type Deepening
TITAN Role Quality Control Manager and SSHO
Client Southwind Construction

Does your personnel know the process to work on federal projects?

We know the processes of working with multiple government departments and multiple districts within those departments. Our work primarily involves working with USACE, NAVFAC, Department of Veteran Affairs, Air Force, and GSA.

How much notice is needed in order for you to mobilize to the job?

In many cases, we can be there within a couple days. Our company structure is designed to accommodate the challenging and demanding dredging industry.

What is included in TITAN personnel proposals?

We cover everything needed to get our personnel to your jobsite and keep them there and provide you with a simplistic invoice at the end of the month. Working with TITAN couldn’t be easier!

Leave a Reply